Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Apply Date:
07/22/2024
Applicant:
Description:
MARY ANN CLEVELAND PATH INCLUDE CONCRETE AND PAVED PATH, HEADER CURB, AND THE ADDITION OF CURB & RAMP. NEW IMPROVEMENTS INCLUDE APPROXIMATELY 6,800 LINEAR FEET. ENDS JUST WEST OF SOUTH ATTERBURY WASH WAY AT THE WEST MOST SIDEWALK HOUGHTON ROAD, AT THE TERMINATION OF THE INTERSECTION SIDEWALK, AND PROPOSED CONSTRUCTION ON MARY ANN CLEVELAND WAY BEGINS JUST EAST OF ATTERBERRY WASH WAY AND ENDS JUST EAST OF HOUGHTON RD.

Permit Reviews

Permit Number - TR-ROW-0724-00834
Permit Status: In review
Permit Description: MARY ANN CLEVELAND PATH INCLUDE CONCRETE AND PAVED PATH, HEADER CURB, AND THE ADDITION OF CURB & RAMP. NEW IMPROVEMENTS INCLUDE APPROXIMATELY 6,800 LINEAR FEET. ENDS JUST WEST OF SOUTH ATTERBURY WASH WAY AT THE WEST MOST SIDEWALK HOUGHTON ROAD, AT THE TERMINATION OF THE INTERSECTION SIDEWALK, AND PROPOSED CONSTRUCTION ON MARY ANN CLEVELAND WAY BEGINS JUST EAST OF ATTERBERRY WASH WAY AND ENDS JUST EAST OF HOUGHTON RD.
Start Date Submittal Complete Date Status  
07/23/2024 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0724-00834
Permit Status: In review
Permit Description: MARY ANN CLEVELAND PATH INCLUDE CONCRETE AND PAVED PATH, HEADER CURB, AND THE ADDITION OF CURB & RAMP. NEW IMPROVEMENTS INCLUDE APPROXIMATELY 6,800 LINEAR FEET. ENDS JUST WEST OF SOUTH ATTERBURY WASH WAY AT THE WEST MOST SIDEWALK HOUGHTON ROAD, AT THE TERMINATION OF THE INTERSECTION SIDEWALK, AND PROPOSED CONSTRUCTION ON MARY ANN CLEVELAND WAY BEGINS JUST EAST OF ATTERBERRY WASH WAY AND ENDS JUST EAST OF HOUGHTON RD.
Total Outstanding Activity Conditions - 3
Date Name
07/23/2024 Traffic control set-up approved between 9AM - 3:30PM
07/23/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/23/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206