Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
4301 E 29TH ST BLDG A
Apply Date:
07/16/2024
Applicant:
Brian Conte
Description:
Improve ADA accessibility at the 29th and Belvedere NW bus stop by filling in the gap between the sidewalk and the curb.

Permit Reviews

Permit Number - TR-ROW-0724-00805
Permit Status: Complete
Permit Description: Improve ADA accessibility at the 29th and Belvedere NW bus stop by filling in the gap between the sidewalk and the curb.
Start Date Submittal Complete Date Status  
07/17/2024 RIGHT-OF-WAY REVIEW v.1 07/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0724-00805
Permit Status: Complete
Permit Description: Improve ADA accessibility at the 29th and Belvedere NW bus stop by filling in the gap between the sidewalk and the curb.
Total Outstanding Activity Conditions - 3
Date Name
07/17/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
07/17/2024 Traffic control set-up approved between 9AM - 3:30PM
07/17/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0724-00805
Permit Description: Improve ADA accessibility at the 29th and Belvedere NW bus stop by filling in the gap between the sidewalk and the curb.
Total Completed Inspections - 7
Date Description Inspector Results Comments
08/05/2024 TRSP - ROW - SITE INSPECTION Passed area between curb and sidewalk excavated and compacted for a 6” pad. contractor tying to order concrete for today
08/30/2024 TRSP - ROW - Barricade - Setup/Routine Passed Zachary Staten: work already completed and traffic control elements removed
08/30/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Zachary Staten: Work already completed
08/30/2024 TRSP - ROW - Barricade Takedown Passed Zach Staten
08/30/2024 TRSP - ROW - Final Passed Zachary Staten
08/30/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Zachary Staten
08/30/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Zachary Staten: no pre-pour inspection, post pour passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
29THBELVEDERENW_PLAN_V1.PDF DOCUMENTS VIEW
29THBELVEDERENW_TRAFFICCONTROL_V1.PDF DOCUMENTS VIEW