Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1110 W GLENN ST
Address NEW:
1110 W GLENN ST
Apply Date:
07/16/2024
Applicant:
Andrew Ruiz
Description:
**24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St at (3) locations to extend sewer and water utilities to new facility.***

Permit Reviews

Permit Number - TR-ROW-0724-00800
Permit Status: Complete
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St at (3) locations to extend sewer and water utilities to new facility.***
Start Date Submittal Complete Date Status  
07/16/2024 RIGHT-OF-WAY REVIEW v.1 07/22/2024 REQUIRES RESUBMIT Review Details
07/22/2024 RIGHT-OF-WAY REVIEW v.2 07/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0724-00800
Permit Status: Complete
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St at (3) locations to extend sewer and water utilities to new facility.***
Total Outstanding Activity Conditions - 4
Date Name
07/16/2024 Traffic control set-up approved between 9AM - 3:30PM
07/16/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
07/16/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
07/22/2024 Multiple Pavement cuts

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0724-00800
Permit Description: **24 HOUR CLOSURE** Wallcon Plumbing will be entering Glenn St at (3) locations to extend sewer and water utilities to new facility.***
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/27/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/30/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
01/29/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
01/29/2025 TRSP - ROW - Barricade Takedown Passed
01/29/2025 TRSP - ROW - Final Passed