Permit: TR-ROW-0724-00794
Permit Details
Apply Date:
07/15/2024
Applicant:
Caitlin Ripley
Description:
Utility locates for prints to be made on upcoming City of Tucson Water Projects,**Use of Ground Penetrating Radar scanning, intersection to be broken down into section while performing work.** .
Permit Reviews
Permit Number - TR-ROW-0724-00794
Permit Status: Complete
Permit Description: Utility locates for prints to be made on upcoming City of Tucson Water Projects,**Use of Ground Penetrating Radar scanning, intersection to be broken down into section while performing work.** .
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/26/2024 | RIGHT-OF-WAY REVIEW v.2 | 07/29/2024 | APPROVED |
07/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/26/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0724-00794
Permit Status: Complete
Permit Description: Utility locates for prints to be made on upcoming City of Tucson Water Projects,**Use of Ground Penetrating Radar scanning, intersection to be broken down into section while performing work.** .
Total Outstanding Activity Conditions - 8
Date | Name |
---|---|
07/16/2024 | Approved & Uploaded Temporary Noise Exemption (TNE) will be required prior to Start of Night Work. Within City of Tucson Right of Way |
07/16/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
07/16/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
07/16/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
07/16/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D |
07/16/2024 | Traffic/Mobility Control Plan (MCP) approved with conditions. |
07/25/2024 | Public Notification |
07/29/2024 | The following extended traffic control set-up times were approved: 12AM-4AM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0724-00794
Permit Description: Utility locates for prints to be made on upcoming City of Tucson Water Projects,**Use of Ground Penetrating Radar scanning, intersection to be broken down into section while performing work.** .
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/13/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
08/26/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
08/26/2024 | TRSP - ROW - Final | Passed |