Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0724-00772
Permit Details
Apply Date:
07/09/2024
Applicant:
ANGEL MORALES
Description:
Equipment in the right of way while they seal coat private property.***
Permit Reviews
Permit Number - TR-ROW-0724-00772
Permit Status: Complete
Permit Description: Equipment in the right of way while they seal coat private property.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0724-00772
Permit Status: Complete
Permit Description: Equipment in the right of way while they seal coat private property.***
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/10/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/10/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 07/10/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanos@tucsonaz.gov or James Degrood at James.degrood@tucsonaz.gov prior to start of work |
| 07/10/2024 | Your project work requires that you contact the Sunnyside School District to alert them and coordinate with them for work within the School Zones |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0724-00772
Permit Description: Equipment in the right of way while they seal coat private property.***
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/18/2024 | TRSP - ROW - Final | Passed |