Permit: TR-ROW-0724-00753
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3008 N ALVERNON WY
Address NEW:
3008 N ALVERNON WY
Apply Date:
07/01/2024
Applicant:
Desert Barricade / Eric Horne
Description:
To make the Alvernon and Blackligde (NE) bus stop ADA-compliant, the sidewalk will be redone to meet finish grade requirements, and the gap between the curb and the sidewalk will be filled.
Permit Reviews
Permit Number - TR-ROW-0724-00753
Permit Status: Complete
Permit Description: To make the Alvernon and Blackligde (NE) bus stop ADA-compliant, the sidewalk will be redone to meet finish grade requirements, and the gap between the curb and the sidewalk will be filled.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0724-00753
Permit Status: Complete
Permit Description: To make the Alvernon and Blackligde (NE) bus stop ADA-compliant, the sidewalk will be redone to meet finish grade requirements, and the gap between the curb and the sidewalk will be filled.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/02/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/02/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/02/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0724-00753
Permit Description: To make the Alvernon and Blackligde (NE) bus stop ADA-compliant, the sidewalk will be redone to meet finish grade requirements, and the gap between the curb and the sidewalk will be filled.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/19/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 07/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/24/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/24/2024 | TRSP - ROW - Final | Passed |