Permit: TR-ROW-0724-00750
Permit Details
Apply Date:
07/01/2024
Applicant:
Desert Barricade / Eric Horne
Description:
The Stone and Roger (SE) Bus stop will be relocated 60 feet North. The gap between the curb and the sidewalk will be filled with concrete to make it ADA-compliant.
Permit Reviews
Permit Number - TR-ROW-0724-00750
Permit Status: Complete
Permit Description: The Stone and Roger (SE) Bus stop will be relocated 60 feet North. The gap between the curb and the sidewalk will be filled with concrete to make it ADA-compliant.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0724-00750
Permit Status: Complete
Permit Description: The Stone and Roger (SE) Bus stop will be relocated 60 feet North. The gap between the curb and the sidewalk will be filled with concrete to make it ADA-compliant.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 07/02/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 07/02/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/02/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0724-00750
Permit Description: The Stone and Roger (SE) Bus stop will be relocated 60 feet North. The gap between the curb and the sidewalk will be filled with concrete to make it ADA-compliant.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/11/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/09/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 07/10/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/11/2024 | TRSP - ROW - Final | Passed |