Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0723-00931
Permit Details
Apply Date:
07/07/2023
Applicant:
Robert Alday
Description:
Installation of pathways and fiber optic cable to connect WAR2 to the City network.
Permit Reviews
Permit Number - TR-ROW-0723-00931
Permit Status: Complete
Permit Description: Installation of pathways and fiber optic cable to connect WAR2 to the City network.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/07/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0723-00931
Permit Status: Complete
Permit Description: Installation of pathways and fiber optic cable to connect WAR2 to the City network.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/07/2023 | Traffic control set-up approved between 9AM - 3:30PM |
07/07/2023 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
07/07/2023 | Other Activities in the Area, Will need to Coordinate Traffic Control setup with Existing setups |
07/07/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0723-00931
Permit Description: Installation of pathways and fiber optic cable to connect WAR2 to the City network.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
12/19/2023 | TRSP - ROW - Recurring | Passed | ||
12/19/2023 | TRSP - ROW - Final/Close-Out | Passed |