Permit: TR-ROW-0723-00926
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
128 S 5TH AV UNIT 220
Address NEW:
128 S 5TH AV UNIT 220
Apply Date:
07/05/2023
Applicant:
Jeff MYers-Fulgham
Description:
Tucson Pride Parade staging on 13th, 14th and 15th street Parade begins on Stone the Ochoa, 12th Ave, down ends on 13th and 6th ave. staging starts at 4:00pm Main Route starts at 7:00Pm Traffic control set up 1600hrs with take down at approximately 2200hrs
Permit Reviews
Permit Number - TR-ROW-0723-00926
Permit Status: Complete
Permit Description: Tucson Pride Parade
staging on 13th, 14th and 15th street
Parade begins on Stone the Ochoa, 12th Ave, down ends on 13th and 6th ave.
staging starts at 4:00pm
Main Route starts at 7:00Pm
Traffic control set up 1600hrs with take down at approximately 2200hrs
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2023 | RIGHT-OF-WAY SIMPLE REVIEW v.2 | 09/12/2023 | APPROVED |
| 07/05/2023 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | 07/26/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0723-00926
Permit Status: Complete
Permit Description: Tucson Pride Parade
staging on 13th, 14th and 15th street
Parade begins on Stone the Ochoa, 12th Ave, down ends on 13th and 6th ave.
staging starts at 4:00pm
Main Route starts at 7:00Pm
Traffic control set up 1600hrs with take down at approximately 2200hrs
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/11/2023 | CORRECT THE TCP RED LINES AT SET UP |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0723-00926
Permit Description: Tucson Pride Parade
staging on 13th, 14th and 15th street
Parade begins on Stone the Ochoa, 12th Ave, down ends on 13th and 6th ave.
staging starts at 4:00pm
Main Route starts at 7:00Pm
Traffic control set up 1600hrs with take down at approximately 2200hrs
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/30/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/29/2023 | TRSP - ROW - Recurring | Passed |