Permit: TR-ROW-0626-00735
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
4520 S COUNTRY CLUB RD
Address NEW:
4520 S COUNTRY CLUB RD
Apply Date:
06/23/2026
Applicant:
Alexis Otero-Morales
Description:
Installation of New 6", 8" and 12" Water Lines on Country Club Rd between Michigan Street and Milber St. Full Street Closure from 7:00PM TO 5:00AM, ADOT PROJECT I-10 COUNTRY CLUB RD & KINO PARKWAY TI'S TRACS# F054801C Excavation: 880ft***
Permit Reviews
Permit Number - TR-ROW-0626-00735
Permit Status: Needs resubmittal
Permit Description: Installation of New 6", 8" and 12" Water Lines on Country Club Rd between Michigan Street and Milber St. Full Street Closure from 7:00PM TO 5:00AM, ADOT PROJECT I-10 COUNTRY CLUB RD & KINO PARKWAY TI'S TRACS# F054801C
Excavation: 880ft***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00735
Permit Status: Needs resubmittal
Permit Description: Installation of New 6", 8" and 12" Water Lines on Country Club Rd between Michigan Street and Milber St. Full Street Closure from 7:00PM TO 5:00AM, ADOT PROJECT I-10 COUNTRY CLUB RD & KINO PARKWAY TI'S TRACS# F054801C
Excavation: 880ft***
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/24/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/24/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 06/24/2026 | Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW |
| 06/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |