Permit: TR-ROW-0626-00732
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
6325 S DESERT PEAK DR
Address NEW:
6325 S DESERT PEAK DR
Apply Date:
06/21/2026
Applicant:
Paula Blanchard
Description:
Request to change media in Right of Way area from gravel to stone pavers, 40.5" out from the edge of either side of the driveway.
Permit Reviews
Permit Number - TR-ROW-0626-00732
Permit Status: Complete
Permit Description: Request to change media in Right of Way area from gravel to stone pavers, 40.5" out from the edge of either side of the driveway.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00732
Permit Status: Complete
Permit Description: Request to change media in Right of Way area from gravel to stone pavers, 40.5" out from the edge of either side of the driveway.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/24/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/24/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0626-00732
Permit Description: Request to change media in Right of Way area from gravel to stone pavers, 40.5" out from the edge of either side of the driveway.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Paula, job is expected to take 4 hours within the next 2 weeks | |
| 07/06/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | no impact to sidewalk or roadway access, no devices in use | |
| 07/21/2026 | TRSP - ROW - Final | Passed | new additions completed, site clear of debris and devices, approved |