Permit: TR-ROW-0626-00730
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW)
Address:
2343 E TOURNAMENT WY
Address NEW:
2343 E TOURNAMENT WY
Apply Date:
06/19/2026
Applicant:
Andrew Ruiz
Description:
Saw cut and tie-in to existing 18" water line belonging to Tucson Water per approved plans P25PW00022 in the East lane of the North bound traffic on Kino Parkway. Future location of new traffic controlled intersection for the Mosaic Quarter Project.
Permit Reviews
Permit Number - TR-ROW-0626-00730
Permit Status: Approved
Permit Description: Saw cut and tie-in to existing 18" water line belonging to Tucson Water per approved plans P25PW00022 in the East lane of the North bound traffic on Kino Parkway. Future location of new traffic controlled intersection for the Mosaic Quarter Project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00730
Permit Status: Approved
Permit Description: Saw cut and tie-in to existing 18" water line belonging to Tucson Water per approved plans P25PW00022 in the East lane of the North bound traffic on Kino Parkway. Future location of new traffic controlled intersection for the Mosaic Quarter Project.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 06/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/24/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/24/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/24/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/01/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/01/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 07/01/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/01/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/01/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64 |