Permit: TR-ROW-0626-00718
Permit Details
Apply Date:
06/15/2026
Applicant:
Alexis Schagel
Description:
The contractor requires permission to park a crane within the public right-of-way for the purpose of replacing equipment. This activity will take place along N Scott between the intersection of E Congress St and E Pennington St. 70ton crane and our swing radius will be around 80ft. The foot print of the crane 50ft x 25ft without triggers fully extended (DTM ZS - Added from provided Email) 6/15/26 Contractor to set up road closure to remove equipment form job site with crane
Permit Reviews
Permit Number - TR-ROW-0626-00718
Permit Status: Complete
Permit Description: The contractor requires permission to park a crane within the public right-of-way for the purpose of replacing equipment. This activity will take place along N Scott between the intersection of E Congress St and E Pennington St.
70ton crane and our swing radius will be around 80ft. The foot print of the crane 50ft x 25ft without triggers fully extended (DTM ZS - Added from provided Email)
6/15/26 Contractor to set up road closure to remove equipment form job site with crane
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00718
Permit Status: Complete
Permit Description: The contractor requires permission to park a crane within the public right-of-way for the purpose of replacing equipment. This activity will take place along N Scott between the intersection of E Congress St and E Pennington St.
70ton crane and our swing radius will be around 80ft. The foot print of the crane 50ft x 25ft without triggers fully extended (DTM ZS - Added from provided Email)
6/15/26 Contractor to set up road closure to remove equipment form job site with crane
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/16/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/23/2026 | The following extended traffic control set-up times were approved: |
| 06/23/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/23/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/23/2026 | Weekend or After hours IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR MIKE BRAVIN AT 520-403-1236 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0626-00718
Permit Description: The contractor requires permission to park a crane within the public right-of-way for the purpose of replacing equipment. This activity will take place along N Scott between the intersection of E Congress St and E Pennington St.
70ton crane and our swing radius will be around 80ft. The foot print of the crane 50ft x 25ft without triggers fully extended (DTM ZS - Added from provided Email)
6/15/26 Contractor to set up road closure to remove equipment form job site with crane
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/27/2026 | TRSP - ROW - Final | Passed |