Permit: TR-ROW-0626-00712
Permit Details
Apply Date:
06/12/2026
Applicant:
ANGEL MORALES
Description:
Replacing concrete collars (Per Contractor included Narrative work are located at 250 E 4th St)
Permit Reviews
Permit Number - TR-ROW-0626-00712
Permit Status: Fees due
Permit Description: Replacing concrete collars
(Per Contractor included Narrative work are located at 250 E 4th St)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/12/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
| 06/15/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/24/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00712
Permit Status: Fees due
Permit Description: Replacing concrete collars
(Per Contractor included Narrative work are located at 250 E 4th St)
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 06/15/2026 | Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 06/15/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/15/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/15/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/24/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 06/24/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL |
| 06/24/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |