Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
234 E 4TH ST
Address NEW:
234 E 4TH ST
Apply Date:
06/12/2026
Applicant:
ANGEL MORALES
Description:
Replacing concrete collars (Per Contractor included Narrative work are located at 250 E 4th St)

Permit Reviews

Permit Number - TR-ROW-0626-00712
Permit Status: Fees due
Permit Description: Replacing concrete collars (Per Contractor included Narrative work are located at 250 E 4th St)
Start Date Submittal Complete Date Status  
06/12/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details
06/15/2026 RIGHT-OF-WAY REVIEW v.2 06/24/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0626-00712
Permit Status: Fees due
Permit Description: Replacing concrete collars (Per Contractor included Narrative work are located at 250 E 4th St)
Total Outstanding Activity Conditions - 8
Date Name
06/15/2026 Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
06/15/2026 Traffic Control set-up approved between 7AM - 5PM
06/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/24/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
06/24/2026 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL
06/24/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)

Documents

File Name Document Type  
250 E 4TH ST JO 125041 TC MOCK UP_V1.PDF DOCUMENTS VIEW
ACH11931 JO 125041 4TH AND FERRO_V1.PDF DOCUMENTS VIEW
ACH11932 125041-2 4TH AND ARIZONA_V1.PDF DOCUMENTS VIEW
ACH11933 - 125041 - 3 4TH AND HERBERT_V1.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER 250 4TH_V1.PDF DOCUMENTS VIEW