Description:
The crew will be performing concrete removal and replacement to repair an existing golf cart path. All work will be conducted within the designated right-of-way, utilizing an access point located directly off the roadway on W Starr Pass Blvd.
Permit Reviews
Permit Number - TR-ROW-0626-00709
Permit Status: Needs resubmittal
Permit Description: The crew will be performing concrete removal and replacement to repair an existing golf cart path. All work will be conducted within the designated right-of-way, utilizing an access point located directly off the roadway on W Starr Pass Blvd.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00709
Permit Status: Needs resubmittal
Permit Description: The crew will be performing concrete removal and replacement to repair an existing golf cart path. All work will be conducted within the designated right-of-way, utilizing an access point located directly off the roadway on W Starr Pass Blvd.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/15/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/15/2026 | STAR PASS BLVD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 06/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/15/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |