Permit: TR-ROW-0626-00699
Permit Details
Apply Date:
06/10/2026
Applicant:
Anthony Mills
Description:
Repair existing sewer on Ochoa side of property into westbound traffic lane (approx. 4' x 20' from building) and perform backflow work on sidewalk on west side of building (aprox. 4'x4', no brick removal)
Permit Reviews
Permit Number - TR-ROW-0626-00699
Permit Status: Issued
Permit Description: Repair existing sewer on Ochoa side of property into westbound traffic lane (approx. 4' x 20' from building) and perform backflow work on sidewalk on west side of building (aprox. 4'x4', no brick removal)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/23/2026 | APPROVED |
| 06/10/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00699
Permit Status: Issued
Permit Description: Repair existing sewer on Ochoa side of property into westbound traffic lane (approx. 4' x 20' from building) and perform backflow work on sidewalk on west side of building (aprox. 4'x4', no brick removal)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/11/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 06/11/2026 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |
| 06/11/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/11/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/11/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/11/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |