Permit: TR-ROW-0626-00685
Permit Details
Apply Date:
06/04/2026
Applicant:
Paolo DeLorenzo
Description:
Curb Cut at West elevation of property off of Bentley Ave.
Permit Reviews
Permit Number - TR-ROW-0626-00685
Permit Status: Complete
Permit Description: Curb Cut at West elevation of property off of Bentley Ave.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/17/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00685
Permit Status: Complete
Permit Description: Curb Cut at West elevation of property off of Bentley Ave.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/09/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/09/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/09/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/17/2026 | Driveway to meet PAG 206 Standard Detail Design, TSM Section 10-01.4.3 Concrete Construction, Chapter 25 Section 25-38 Driveway/Curb Cut requirements. |
| 06/17/2026 | Placement to comply with DTM Chapter 25-38 code/policy |
| 06/17/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0626-00685
Permit Description: Curb Cut at West elevation of property off of Bentley Ave.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/30/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/06/2026 | TRSP - ROW - Final | Passed |