Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
225 W PASTIME RD
Address NEW:
225 W PASTIME RD
Apply Date:
06/03/2026
Applicant:
Ronald Gallagher
Description:
ADDING AN APRON PAG 206

Permit Reviews

Permit Number - TR-ROW-0626-00683
Permit Status: Complete
Permit Description: ADDING AN APRON PAG 206
Start Date Submittal Complete Date Status  
06/04/2026 RIGHT-OF-WAY REVIEW v.1 06/08/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0626-00683
Permit Status: Complete
Permit Description: ADDING AN APRON PAG 206
Total Outstanding Activity Conditions - 4
Date Name
06/08/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
06/08/2026 Install Driveway Apron Per PAG SD 206
06/08/2026 W Pastime Dr is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required if any cuts are made to the pavement. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.
06/08/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0626-00683
Permit Description: ADDING AN APRON PAG 206
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/30/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed driveway apron and curb cut
07/27/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/27/2026 TRSP - ROW - Backfill - Placement/Compaction Passed work will possibly be completed this week before the July 30 expiration or they will have to extend their permit
08/03/2026 TRSP - ROW - Final Passed Driveway apron per 206. There are no sidewalks in the area on the side of the road, but it meets the drawings in the plans.
08/03/2026 TRSP - ROW - Field Change Request Passed Work has been completed the 206 standard