Permit: TR-ROW-0626-00673
Permit Details
Apply Date:
06/02/2026
Applicant:
Ramon VALDEZ
Description:
Sidewalk for new construction.
Permit Reviews
Permit Number - TR-ROW-0626-00673
Permit Status: Complete
Permit Description: Sidewalk for new construction.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0626-00673
Permit Status: Complete
Permit Description: Sidewalk for new construction.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/04/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/04/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/04/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/04/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/08/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 06/08/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/08/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0626-00673
Permit Description: Sidewalk for new construction.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/12/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/12/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 06/16/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 06/17/2026 | TRSP - ROW - Final | Passed |