Permit: TR-ROW-0625-00864
Permit Details
Apply Date:
06/26/2025
Applicant:
Armando Bracamonte
Description:
The contractor will be working on meter pedestal for the City of Tucson Transportation Inspection. No Traffic control needed as we will not be working on the street or pedestrian walkway. We will not disturb asphalt & dirt. 90 day permit 10/07/2025- (Request 90 Day Renewal as of 10/06/2025)
Permit Reviews
Permit Number - TR-ROW-0625-00864
Permit Status: Complete
Permit Description: The contractor will be working on meter pedestal for the City of Tucson Transportation Inspection. No Traffic control needed as we will not be working on the street or pedestrian walkway. We will not disturb asphalt & dirt. 90 day permit
10/07/2025- (Request 90 Day Renewal as of 10/06/2025)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/27/2025 | REQUIRES RESUBMIT |
| 07/02/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/07/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00864
Permit Status: Complete
Permit Description: The contractor will be working on meter pedestal for the City of Tucson Transportation Inspection. No Traffic control needed as we will not be working on the street or pedestrian walkway. We will not disturb asphalt & dirt. 90 day permit
10/07/2025- (Request 90 Day Renewal as of 10/06/2025)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/27/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/07/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 07/07/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0625-00864
Permit Description: The contractor will be working on meter pedestal for the City of Tucson Transportation Inspection. No Traffic control needed as we will not be working on the street or pedestrian walkway. We will not disturb asphalt & dirt. 90 day permit
10/07/2025- (Request 90 Day Renewal as of 10/06/2025)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 10/01/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/06/2025 | TRSP - ROW - Final | Passed |