Permit: TR-ROW-0625-00823
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2701 N LOS ALTOS AV
Address NEW:
2701 N LOS ALTOS AV
Apply Date:
06/18/2025
Applicant:
Cameron Bonner
Description:
324060 Site 2 - Install Approximately 332LF of 8" Cured In Place Pipe. Bench Rehab's will be completed on MH's 9444-49 and 9444-50.
Permit Reviews
Permit Number - TR-ROW-0625-00823
Permit Status: Complete
Permit Description: 324060 Site 2 - Install Approximately 332LF of 8" Cured In Place Pipe. Bench Rehab's will be completed on MH's 9444-49 and 9444-50.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/23/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | RIGHT-OF-WAY REVIEW v.2 | 06/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00823
Permit Status: Complete
Permit Description: 324060 Site 2 - Install Approximately 332LF of 8" Cured In Place Pipe. Bench Rehab's will be completed on MH's 9444-49 and 9444-50.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/20/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 06/20/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/23/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/23/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0625-00823
Permit Description: 324060 Site 2 - Install Approximately 332LF of 8" Cured In Place Pipe. Bench Rehab's will be completed on MH's 9444-49 and 9444-50.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/25/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/25/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/25/2025 | TRSP - ROW - Final | Passed |