Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0625-00818
Permit Details
Apply Date:
06/17/2025
Applicant:
BRIAN MAJUTA JR
Description:
The scope of work includes the following: Sidewalk Improvements • All existing sidewalks along Tucson Blvd and Lee Street will be reconstructed to comply with P.A.G. Standard Detail 200 and will be fully ADA-compliant. Driveway Modifications • N. Tucson Blvd Driveway: The existing driveway will be reconstructed to meet all applicable City codes and ADA standards. • Lee Street Driveways: o The driveway adjacent to Tucson Blvd will be reconstructed to current code and ADA standards. o The center driveway on Lee Street will be permanently removed. o The driveway located near the adjacent property will be relocated 18’ west. To accommodate this, the existing bus stop will be shifted 15’ west. A sidewalk segment of 47’-7” inches will be preserved for safe and accessible bus loading/unloading.
Permit Reviews
Permit Number - TR-ROW-0625-00818
Permit Status: Complete
Permit Description: The scope of work includes the following:
Sidewalk Improvements
• All existing sidewalks along Tucson Blvd and Lee Street will be reconstructed to comply
with P.A.G. Standard Detail 200 and will be fully ADA-compliant.
Driveway Modifications
• N. Tucson Blvd Driveway: The existing driveway will be reconstructed to meet all
applicable City codes and ADA standards.
• Lee Street Driveways:
o The driveway adjacent to Tucson Blvd will be reconstructed to current code and
ADA standards.
o The center driveway on Lee Street will be permanently removed.
o The driveway located near the adjacent property will be relocated 18’ west. To
accommodate this, the existing bus stop will be shifted 15’ west. A sidewalk
segment of 47’-7” inches will be preserved for safe and accessible bus
loading/unloading.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2025 | RIGHT-OF-WAY REVIEW v.3 | 07/02/2025 | APPROVED |
| 07/01/2025 | RIGHT-OF-WAY REVIEW v.2 | 07/02/2025 | REQUIRES RESUBMIT |
| 06/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/18/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00818
Permit Status: Complete
Permit Description: The scope of work includes the following:
Sidewalk Improvements
• All existing sidewalks along Tucson Blvd and Lee Street will be reconstructed to comply
with P.A.G. Standard Detail 200 and will be fully ADA-compliant.
Driveway Modifications
• N. Tucson Blvd Driveway: The existing driveway will be reconstructed to meet all
applicable City codes and ADA standards.
• Lee Street Driveways:
o The driveway adjacent to Tucson Blvd will be reconstructed to current code and
ADA standards.
o The center driveway on Lee Street will be permanently removed.
o The driveway located near the adjacent property will be relocated 18’ west. To
accommodate this, the existing bus stop will be shifted 15’ west. A sidewalk
segment of 47’-7” inches will be preserved for safe and accessible bus
loading/unloading.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/18/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/18/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/02/2025 | The following extended traffic control set-up times were approved: |
| 07/02/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 07/02/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST MARKED ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 07/02/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0625-00818
Permit Description: The scope of work includes the following:
Sidewalk Improvements
• All existing sidewalks along Tucson Blvd and Lee Street will be reconstructed to comply
with P.A.G. Standard Detail 200 and will be fully ADA-compliant.
Driveway Modifications
• N. Tucson Blvd Driveway: The existing driveway will be reconstructed to meet all
applicable City codes and ADA standards.
• Lee Street Driveways:
o The driveway adjacent to Tucson Blvd will be reconstructed to current code and
ADA standards.
o The center driveway on Lee Street will be permanently removed.
o The driveway located near the adjacent property will be relocated 18’ west. To
accommodate this, the existing bus stop will be shifted 15’ west. A sidewalk
segment of 47’-7” inches will be preserved for safe and accessible bus
loading/unloading.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/03/2025 | TRSP - ROW - Final | Passed |