Permit: TR-ROW-0625-00775
Permit Details
Apply Date:
06/06/2025
Applicant:
ALICIA OROZCO
Description:
1-40 YRD ROLL OFF TO BE DELIVERED ON 06/27 AND REMOVED ON 7/14 WILL BE PLACED IN FRONT OF HOME OFF TREAT
Permit Reviews
Permit Number - TR-ROW-0625-00775
Permit Status: Complete
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 06/27 AND REMOVED ON 7/14 WILL BE PLACED IN FRONT OF HOME OFF TREAT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00775
Permit Status: Complete
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 06/27 AND REMOVED ON 7/14 WILL BE PLACED IN FRONT OF HOME OFF TREAT
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/09/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 06/09/2025 | The roll-off container shall be positioned at a sufficient distance from 6th street to insure that sightlines for southbound vehicular traffic are not obstructed due to high volume traffic nature of the roadway. |
| 06/09/2025 | BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0625-00775
Permit Description: 1-40 YRD ROLL OFF TO BE DELIVERED ON 06/27 AND REMOVED ON 7/14 WILL BE PLACED IN FRONT OF HOME OFF TREAT
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/19/2025 | TRSP - ROW - Final | Passed |