Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3701 E 3RD ST
Address NEW:
3701 E 3RD ST
Apply Date:
06/05/2025
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Grading, Paving, Concrete placement, utility, landscaping.

Permit Reviews

Permit Number - TR-ROW-0625-00773
Permit Status: Complete
Permit Description: Grading, Paving, Concrete placement, utility, landscaping.
Start Date Submittal Complete Date Status  
06/06/2025 RIGHT-OF-WAY REVIEW v.1 06/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0625-00773
Permit Status: Complete
Permit Description: Grading, Paving, Concrete placement, utility, landscaping.
Total Outstanding Activity Conditions - 2
Date Name
06/06/2025 PRE-CON/PAVEMENT/SIDEWALK
06/06/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0625-00773
Permite Description: Grading, Paving, Concrete placement, utility, landscaping.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
09/09/2025 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
09/09/2025 TRSP - ROW - Barricade Takedown N/A Re-inspection required
09/09/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
09/09/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0625-00773
Permit Description: Grading, Paving, Concrete placement, utility, landscaping.
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/09/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed
04/13/2026 TRSP - ROW - Barricade - Setup/Routine Passed
04/13/2026 TRSP - ROW - Barricade Takedown Passed
04/13/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
04/13/2026 TRSP - ROW - Final Passed