Permit: TR-ROW-0624-00748
Permit Details
Apply Date:
06/28/2024
Applicant:
ANGEL MORALES
Description:
CRANE WORK ROAD CLOSURE 6PM-5AM 8/5 - 8/9 . CRANE WILL BE PARKED BEHIND CURRENT ROW BARRICADES DURING THE DAY. ***
Permit Reviews
Permit Number - TR-ROW-0624-00748
Permit Status: Complete
Permit Description: CRANE WORK ROAD CLOSURE 6PM-5AM
8/5 - 8/9 . CRANE WILL BE PARKED BEHIND CURRENT ROW BARRICADES DURING THE DAY. ***
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/01/2024 | REQUIRES RESUBMIT |
07/01/2024 | RIGHT-OF-WAY REVIEW v.2 | 07/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0624-00748
Permit Status: Complete
Permit Description: CRANE WORK ROAD CLOSURE 6PM-5AM
8/5 - 8/9 . CRANE WILL BE PARKED BEHIND CURRENT ROW BARRICADES DURING THE DAY. ***
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
07/01/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
07/01/2024 | Approved Temporary Noise Exemption (TNE) will be required prior to Start of Night Work. TNE will need to be uploaded to permit application for Successful permit approval. |
07/01/2024 | Traffic/Mobility Control Plan (MCP) approved with conditions. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0624-00748
Permit Description: CRANE WORK ROAD CLOSURE 6PM-5AM
8/5 - 8/9 . CRANE WILL BE PARKED BEHIND CURRENT ROW BARRICADES DURING THE DAY. ***
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/03/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/03/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |