Permit: TR-ROW-0624-00747
Permit Details
Apply Date:
06/28/2024
Applicant:
Arturo Ledesma
Description:
GEOTECHNICAL EVALAUTION ALONG 22ND ST FROM CAMINO SECO TO HOUGHTON. OUR EVALAUTION WILL INCLUDE 16 BORINGS WITHIN THE ROADWAY DRILLED TO A DEPTH OF 5'. OUR EVALUATION WILL ALSO INCLUDE 4 BORINGS WITHIN THE ROADWAY SHOULDER DRILLED TO A DEPTH OF 15'. BORINGS RESULT IN AN 8-10 INCH DIAMETER HOLE IN THE PAVEMENT/GROUND. 08/16/2024 - Revised traffic control plan for shadow truck added.
Permit Reviews
Permit Number - TR-ROW-0624-00747
Permit Status: Complete
Permit Description: GEOTECHNICAL EVALAUTION ALONG 22ND ST FROM CAMINO SECO TO HOUGHTON.
OUR EVALAUTION WILL INCLUDE 16 BORINGS WITHIN THE ROADWAY DRILLED TO A DEPTH OF 5'.
OUR EVALUATION WILL ALSO INCLUDE 4 BORINGS WITHIN THE ROADWAY SHOULDER DRILLED TO A DEPTH OF 15'.
BORINGS RESULT IN AN 8-10 INCH DIAMETER HOLE IN THE PAVEMENT/GROUND.
08/16/2024 - Revised traffic control plan for shadow truck added.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/12/2024 | RIGHT-OF-WAY REVIEW v.3 | 07/18/2024 | REQUIRES RESUBMIT |
| 07/23/2024 | RIGHT-OF-WAY REVIEW v.4 | 07/24/2024 | APPROVED |
| 08/06/2024 | RIGHT-OF-WAY REVIEW REVISION v.1 | 08/06/2024 | APPROVED |
| 10/01/2024 | RIGHT-OF-WAY REVIEW v.3 | 10/01/2024 | APPROVED |
| 07/08/2024 | RIGHT-OF-WAY REVIEW v.2 | 07/10/2024 | REQUIRES RESUBMIT |
| 09/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/23/2024 | REQUIRES RESUBMIT |
| 09/27/2024 | RIGHT-OF-WAY REVIEW v.2 | 09/30/2024 | REQUIRES RESUBMIT |
| 06/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 07/04/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0624-00747
Permit Status: Complete
Permit Description: GEOTECHNICAL EVALAUTION ALONG 22ND ST FROM CAMINO SECO TO HOUGHTON.
OUR EVALAUTION WILL INCLUDE 16 BORINGS WITHIN THE ROADWAY DRILLED TO A DEPTH OF 5'.
OUR EVALUATION WILL ALSO INCLUDE 4 BORINGS WITHIN THE ROADWAY SHOULDER DRILLED TO A DEPTH OF 15'.
BORINGS RESULT IN AN 8-10 INCH DIAMETER HOLE IN THE PAVEMENT/GROUND.
08/16/2024 - Revised traffic control plan for shadow truck added.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/28/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/28/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0624-00747
Permite Description: GEOTECHNICAL EVALAUTION ALONG 22ND ST FROM CAMINO SECO TO HOUGHTON.
OUR EVALAUTION WILL INCLUDE 16 BORINGS WITHIN THE ROADWAY DRILLED TO A DEPTH OF 5'.
OUR EVALUATION WILL ALSO INCLUDE 4 BORINGS WITHIN THE ROADWAY SHOULDER DRILLED TO A DEPTH OF 15'.
BORINGS RESULT IN AN 8-10 INCH DIAMETER HOLE IN THE PAVEMENT/GROUND.
08/16/2024 - Revised traffic control plan for shadow truck added.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Partial Pass | 4 more bore locations completed, calling inspection again after another round is complete |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0624-00747
Permit Description: GEOTECHNICAL EVALAUTION ALONG 22ND ST FROM CAMINO SECO TO HOUGHTON.
OUR EVALAUTION WILL INCLUDE 16 BORINGS WITHIN THE ROADWAY DRILLED TO A DEPTH OF 5'.
OUR EVALUATION WILL ALSO INCLUDE 4 BORINGS WITHIN THE ROADWAY SHOULDER DRILLED TO A DEPTH OF 15'.
BORINGS RESULT IN AN 8-10 INCH DIAMETER HOLE IN THE PAVEMENT/GROUND.
08/16/2024 - Revised traffic control plan for shadow truck added.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | contractor stated that they were approved to use cold patch. per Dan Robertson T top will be needed for restoration. nenyo and Moore is going to get back to me about restoration | |
| 08/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/07/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 10/02/2024 | TRSP - ROW - Barricade Takedown | Passed | all bore sites completed, traffic elements removed | |
| 11/27/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | All boring completed on 10/2 | |
| 11/27/2024 | TRSP - ROW - Final/Close-Out | Passed | All boring completed on 10/2, all traffic control removed, site completed |