Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Apply Date:
06/18/2024
Applicant:
Ben Lozano
Description:
NORTH DODGE CONSTRUCTION WILL BE REPAIRING SEWER LINE.

Permit Reviews

Permit Number - TR-ROW-0624-00705
Permit Status: Issued
Permit Description: NORTH DODGE CONSTRUCTION WILL BE REPAIRING SEWER LINE.
Start Date Submittal Complete Date Status  
07/05/2024 RIGHT-OF-WAY REVIEW v.2 07/10/2024 APPROVED Review Details
06/18/2024 RIGHT-OF-WAY REVIEW v.1 06/26/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0624-00705
Permit Status: Issued
Permit Description: NORTH DODGE CONSTRUCTION WILL BE REPAIRING SEWER LINE.
Total Outstanding Activity Conditions - 3
Date Name
06/18/2024 Traffic control set-up approved between 9AM - 3:30PM
06/18/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
06/18/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-ROW-0624-00705
Permite Description: NORTH DODGE CONSTRUCTION WILL BE REPAIRING SEWER LINE.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/13/2024 TRSP - ROW - Paving - Subgrade/removal/placement N/A Re-inspection required no asphalt restoration required
08/29/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required work completed, waiting for density reports and AB material ticket from contractor

Completed Inspections

Permit Status: Issued
Permit Number: TR-ROW-0624-00705
Permit Description: NORTH DODGE CONSTRUCTION WILL BE REPAIRING SEWER LINE.
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/17/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed chain link required around trench. contractor was notified.
08/13/2024 TRSP - ROW - Barricade - Setup/Routine Passed
08/13/2024 TRSP - ROW - Barricade Takedown Passed work area cleared of barricade devices
09/03/2024 TRSP - ROW - Final/Close-Out Passed compaction test received all work complete
08/23/2024 TRSP - ROW - SITE INSPECTION Passed backfill completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
N DODGE CONSTRUCTION TCP-2 4110 S HOUGHTON-MODEL_V1.PDF DOCUMENTS VIEW