Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
2001 W STARR PASS BL
Apply Date:
06/14/2024
Applicant:
Andrew Ruiz
Description:
Staging LNG Trailer for Natural Gas Facility on Greasewood S/O Starr Pass Blvd, 24 Hour Closure.***

Permit Reviews

Permit Number - TR-ROW-0624-00694
Permit Status: Complete
Permit Description: Staging LNG Trailer for Natural Gas Facility on Greasewood S/O Starr Pass Blvd, 24 Hour Closure.***
Start Date Submittal Complete Date Status  
06/17/2024 RIGHT-OF-WAY REVIEW v.1 06/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0624-00694
Permit Status: Complete
Permit Description: Staging LNG Trailer for Natural Gas Facility on Greasewood S/O Starr Pass Blvd, 24 Hour Closure.***
Total Outstanding Activity Conditions - 3
Date Name
06/17/2024 Traffic control set-up approved between 9AM - 3:30PM
06/17/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206
06/25/2024 Work can't take place on 7/3-7/4 due to the increase of traffic for 4th of July Celebration in the area

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0624-00694
Permit Description: Staging LNG Trailer for Natural Gas Facility on Greasewood S/O Starr Pass Blvd, 24 Hour Closure.***
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/30/2024 TRSP - ROW - Barricade - Setup/Routine Passed
07/30/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/30/2024 TRSP - ROW - Barricade Takedown Passed
07/30/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
EL PASO GAS - STARR PASS - GREASWOOD - MIDBLOCK - SHOULDER CL - L1015 REMEDIATIONS_V1.PDF DOCUMENTS VIEW
GREASEWOOD AND STARR PASS BLVD_V1.PDF DOCUMENTS VIEW