Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Right-of-Way (ROW)
Address:
400 W CUSHING ST
Apply Date:
06/14/2024
Applicant:
Joshua Rothschild
Description:
El Tour de Tucson is scheduled for November 23, 2024. The Event will consist of various route throughout Tucson, Pima County, ADOT, Sahuarita and City of South Tucson with distances of 102, 63, 32, 5 and 1 mile along with a 5k Walk/Run. Start line begin on Cushing, provide hard closure at Cushing and El Paso, include 3,200 feet of Pedestrian Railing for Cushing (2 days only Friday and Saturday). One Mile Fun Ride: Begin on Cushing Street, turn right on Stone to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to West Simpson and turn right. End at El Parque de San Cosme. Three Mile Fun Ride: Begin on Cushing Street, turn right on Stone, go to 15th Street turn left, go to 4th Avenue turn left, go to 12th Street turn right, go to 3rd Avenue turn right, go to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to Simpson turn right, End at El Parque de San Cosme.

Permit Reviews

Permit Number - TR-ROW-0624-00692
Permit Status: Approved
Permit Description: El Tour de Tucson is scheduled for November 23, 2024. The Event will consist of various route throughout Tucson, Pima County, ADOT, Sahuarita and City of South Tucson with distances of 102, 63, 32, 5 and 1 mile along with a 5k Walk/Run. Start line begin on Cushing, provide hard closure at Cushing and El Paso, include 3,200 feet of Pedestrian Railing for Cushing (2 days only Friday and Saturday). One Mile Fun Ride: Begin on Cushing Street, turn right on Stone to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to West Simpson and turn right. End at El Parque de San Cosme. Three Mile Fun Ride: Begin on Cushing Street, turn right on Stone, go to 15th Street turn left, go to 4th Avenue turn left, go to 12th Street turn right, go to 3rd Avenue turn right, go to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to Simpson turn right, End at El Parque de San Cosme.
Start Date Submittal Complete Date Status  
08/13/2024 RIGHT-OF-WAY SIMPLE REVIEW v.2 08/19/2024 REQUIRES RESUBMIT Review Details
06/17/2024 RIGHT-OF-WAY SIMPLE REVIEW v.1 06/25/2024 REQUIRES RESUBMIT Review Details
09/17/2024 RIGHT-OF-WAY SIMPLE REVIEW v.3 09/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0624-00692
Permit Status: Approved
Permit Description: El Tour de Tucson is scheduled for November 23, 2024. The Event will consist of various route throughout Tucson, Pima County, ADOT, Sahuarita and City of South Tucson with distances of 102, 63, 32, 5 and 1 mile along with a 5k Walk/Run. Start line begin on Cushing, provide hard closure at Cushing and El Paso, include 3,200 feet of Pedestrian Railing for Cushing (2 days only Friday and Saturday). One Mile Fun Ride: Begin on Cushing Street, turn right on Stone to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to West Simpson and turn right. End at El Parque de San Cosme. Three Mile Fun Ride: Begin on Cushing Street, turn right on Stone, go to 15th Street turn left, go to 4th Avenue turn left, go to 12th Street turn right, go to 3rd Avenue turn right, go to 18th Street turn right, go to El Paso & Southwestern Greenway turn right, go to Simpson turn right, End at El Parque de San Cosme.
Total Outstanding Activity Conditions - 3
Date Name
08/13/2024 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
08/13/2024 The following extended traffic control set-up times were approved:
08/13/2024 Bus Stop/Route