Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0624-00687
Permit Details
Apply Date:
06/13/2024
Applicant:
Jason Reynolds
Description:
Flood repairs are being done in home. Contents of home are being stored in storage container until repairs are done. Repairs have been taking longer than expected due to material being unavailable. Repairs should be done in the next 30 days.
Permit Reviews
Permit Number - TR-ROW-0624-00687
Permit Status: Complete
Permit Description: Flood repairs are being done in home. Contents of home are being stored in storage container until repairs are done. Repairs have been taking longer than expected due to material being unavailable. Repairs should be done in the next 30 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0624-00687
Permit Status: Complete
Permit Description: Flood repairs are being done in home. Contents of home are being stored in storage container until repairs are done. Repairs have been taking longer than expected due to material being unavailable. Repairs should be done in the next 30 days.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/14/2024 | BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OFFS OR PODS PLACED IN CITY R.O.W. Roll-offs/Dumpsters/PODS 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0624-00687
Permit Description: Flood repairs are being done in home. Contents of home are being stored in storage container until repairs are done. Repairs have been taking longer than expected due to material being unavailable. Repairs should be done in the next 30 days.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/23/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/23/2024 | TRSP - ROW - Barricade Takedown | Passed |