Permit: TR-ROW-0624-00680
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
9541 E CALLE EUNICE
Address NEW:
9541 E CALLE EUNICE
Apply Date:
06/11/2024
Applicant:
Cameron Bonner
Description:
323069 Site 4 - Install Approximately 299 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. Bench rehab's and new concrete collars will be completed on MH's 8264-03-2 and MH 8264-03-1 per PCRWRD standard detail 211.
Permit Reviews
Permit Number - TR-ROW-0624-00680
Permit Status: Complete
Permit Description: 323069 Site 4 - Install Approximately 299 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. Bench rehab's and new concrete collars will be completed on MH's 8264-03-2 and MH 8264-03-1 per PCRWRD standard
detail 211.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0624-00680
Permit Status: Complete
Permit Description: 323069 Site 4 - Install Approximately 299 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. Bench rehab's and new concrete collars will be completed on MH's 8264-03-2 and MH 8264-03-1 per PCRWRD standard
detail 211.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/12/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 06/12/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0624-00680
Permit Description: 323069 Site 4 - Install Approximately 299 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. Bench rehab's and new concrete collars will be completed on MH's 8264-03-2 and MH 8264-03-1 per PCRWRD standard
detail 211.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work already completed | |
| 09/19/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | work already completed | |
| 09/19/2024 | TRSP - ROW - Notice of Completion | Passed |