Permit: TR-ROW-0624-00673
Permit Details
Apply Date:
06/11/2024
Applicant:
Patty Noel
Description:
Trench and backfill in dirt and asphalt to install sewer and water. R & R approx 200 LF of asphalt
Permit Reviews
Permit Number - TR-ROW-0624-00673
Permit Status: Issued
Permit Description: Trench and backfill in dirt and asphalt to install sewer and water. R & R approx 200 LF of asphalt
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/24/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/26/2024 | APPROVED |
06/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/21/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0624-00673
Permit Status: Issued
Permit Description: Trench and backfill in dirt and asphalt to install sewer and water. R & R approx 200 LF of asphalt
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
06/11/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
06/11/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0624-00673
Permite Description: Trench and backfill in dirt and asphalt to install sewer and water. R & R approx 200 LF of asphalt
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0624-00673
Permit Description: Trench and backfill in dirt and asphalt to install sewer and water. R & R approx 200 LF of asphalt
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
10/29/2024 | TRSP - ROW - SITE INSPECTION | Passed |