Permit: TR-ROW-0526-00652
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2731 E BROADWAY BL
Address NEW:
2731 E BROADWAY BL
Apply Date:
05/27/2026
Applicant:
Desert Barricade / Eric Horne
Description:
Grading, forms and ww mesh Sidewalk and driveway per standards
Permit Reviews
Permit Number - TR-ROW-0526-00652
Permit Status: Complete
Permit Description: Grading, forms and ww mesh Sidewalk and driveway per standards
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | RIGHT-OF-WAY REVIEW v.2 | 08/10/2026 | APPROVED |
| 05/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/28/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00652
Permit Status: Complete
Permit Description: Grading, forms and ww mesh Sidewalk and driveway per standards
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/28/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/28/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/28/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00652
Permit Description: Grading, forms and ww mesh Sidewalk and driveway per standards
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/03/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/01/2026 | Customer sends in a start work inspection to notify staff that they are beginning work in the ROW. This will not be inspected just acknowledged by staff. | Passed | Started sidewalk this morning to attach to existing sidewalk from building patio to sidewalk right now the percentage is 1% cross slope after they jump in jack. I'll be back at 12 o'clock today to verify still in percentage. verified everything they will be pouring at 4:30 in the morning according to their schedule tomorrow morning. |