Permit: TR-ROW-0526-00618
Permit Details
Apply Date:
05/25/2026
Applicant:
Bryan Guinee
Description:
The Tucson Police Department will be installing camera systems at 70 locations. An excel spreadsheet has been included with all the locations and pole numbers, as well as, a traffic control plan. TPD will be utilizing a TPD marked vehicle to assist with traffic safety. This permit will serge for streetlight(s): Ajo # 11971 (1445 W Ajo Wy)
Permit Reviews
Permit Number - TR-ROW-0526-00618
Permit Status: Issued
Permit Description: The Tucson Police Department will be installing camera systems at 70 locations. An excel spreadsheet has been included with all the locations and pole numbers, as well as, a traffic control plan. TPD will be utilizing a TPD marked vehicle to assist with traffic safety. This permit will serge for streetlight(s): Ajo # 11971 (1445 W Ajo Wy)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/25/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00618
Permit Status: Issued
Permit Description: The Tucson Police Department will be installing camera systems at 70 locations. An excel spreadsheet has been included with all the locations and pole numbers, as well as, a traffic control plan. TPD will be utilizing a TPD marked vehicle to assist with traffic safety. This permit will serge for streetlight(s): Ajo # 11971 (1445 W Ajo Wy)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/29/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/29/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/29/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/29/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |