Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address NEW:
1526 N ALVERNON WY
Apply Date:
05/21/2026
Applicant:
BENJAMIN VOGEL
Description:
Rev 1 - started 06.22.2022 ** Site/Grading/SWPPP - 1526 N. Alvernon Way, three new commercial bldgs, one new food service bldg NEW SIDEWALK AND VEHICULAR ACCESS ALONG LEE STREET

Permit Reviews

Permit Number - TR-ROW-0526-00613
Permit Status: Needs resubmittal
Permit Description: Rev 1 - started 06.22.2022 ** Site/Grading/SWPPP - 1526 N. Alvernon Way, three new commercial bldgs, one new food service bldg NEW SIDEWALK AND VEHICULAR ACCESS ALONG LEE STREET
Start Date Submittal Complete Date Status  
05/29/2026 RIGHT-OF-WAY REVIEW v.2 06/11/2026 REQUIRES RESUBMIT Review Details
05/21/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00613
Permit Status: Needs resubmittal
Permit Description: Rev 1 - started 06.22.2022 ** Site/Grading/SWPPP - 1526 N. Alvernon Way, three new commercial bldgs, one new food service bldg NEW SIDEWALK AND VEHICULAR ACCESS ALONG LEE STREET
Total Outstanding Activity Conditions - 6
Date Name
05/28/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/28/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/28/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/28/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206
06/10/2026 The following extended traffic control set-up times were approved: 24 hr Traffic Control Placement a long Lee St ONLY -
06/10/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety