Permit: TR-ROW-0526-00610
Permit Details
Apply Date:
05/20/2026
Applicant:
david blair
Description:
HCS (sewer) connection
Permit Reviews
Permit Number - TR-ROW-0526-00610
Permit Status: Complete
Permit Description: HCS (sewer) connection
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/21/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00610
Permit Status: Complete
Permit Description: HCS (sewer) connection
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/21/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 05/21/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/21/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 05/21/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/21/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00610
Permit Description: HCS (sewer) connection
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Pre-con held with Mike Braven. Jeremy followed up with on-site, made sure the process was followed correctly. There are photos and uploads from the beginning to the end with proper sand, proper ABC. Tickets and photos of the entirety of the process. | |
| 06/03/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Yes sand over the pipe and 100% ABC backfill to bottom of asphalt see all photos and send picture ticket as well as ABC ticket | |
| 06/05/2026 | TRSP - ROW - Final | Passed |