Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
406 N 6TH AV
Address NEW:
406 N 6TH AV
Apply Date:
05/15/2026
Applicant:
ANGEL MORALES
Description:
CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00379

Permit Reviews

Permit Number - TR-ROW-0526-00597
Permit Status: Inspections
Permit Description: CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00379
Start Date Submittal Complete Date Status  
05/15/2026 RIGHT-OF-WAY REVIEW v.1 05/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00597
Permit Status: Inspections
Permit Description: CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00379
Total Outstanding Activity Conditions - 9
Date Name
05/15/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
05/15/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
05/15/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/15/2026 Traffic Control set-up approved between 7AM - 5PM
05/15/2026 Traffic control set-up approved between 9AM - 3:30PM
05/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/15/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
05/15/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/15/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0526-00597
Permite Description: CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00379
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TR-ROW-0526-00597
Status: Inspections
Description: CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00379
Scheduled Date Description Entered By Entered Date
05/19/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
400 N ARIZONA AVE TC MOCKUP_V1.PDF DOCUMENTS VIEW
ACH11971 ARIZONA AND 6TH ST V2_V1.PDF DOCUMENTS VIEW
ACH11972 ARIZONA AND 7TH V2_V1.PDF DOCUMENTS VIEW