Permit: TR-ROW-0526-00596
Permit Details
Apply Date:
05/15/2026
Applicant:
ANGEL MORALES
Description:
CIPP and Replace existing concrete collars continuation of permit TR-ROW-0426-00383
Permit Reviews
Permit Number - TR-ROW-0526-00596
Permit Status: Complete
Permit Description: CIPP and Replace existing concrete collars
continuation of permit TR-ROW-0426-00383
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00596
Permit Status: Complete
Permit Description: CIPP and Replace existing concrete collars
continuation of permit TR-ROW-0426-00383
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/15/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/15/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 05/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/15/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/15/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00596
Permit Description: CIPP and Replace existing concrete collars
continuation of permit TR-ROW-0426-00383
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/15/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/15/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/15/2026 | TRSP - ROW - Final | Passed |