Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4752 E 4TH ST
Address NEW:
4752 E 4TH ST
Apply Date:
05/15/2026
Applicant:
ANGEL MORALES
Description:
CIPP and replace existing concrete collars this is a continuation of permit TR-ROW-0426-00385 06/12/2026 - Request for 30 Day Renewal as of 06/21/2026

Permit Reviews

Permit Number - TR-ROW-0526-00595
Permit Status: Complete
Permit Description: CIPP and replace existing concrete collars this is a continuation of permit TR-ROW-0426-00385 06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Start Date Submittal Complete Date Status  
05/15/2026 RIGHT-OF-WAY REVIEW v.1 05/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00595
Permit Status: Complete
Permit Description: CIPP and replace existing concrete collars this is a continuation of permit TR-ROW-0426-00385 06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Total Outstanding Activity Conditions - 8
Date Name
05/15/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/15/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
05/15/2026 Traffic Control set-up approved between 7AM - 5PM
05/15/2026 Traffic control set-up approved between 9AM - 3:30PM
05/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/15/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
05/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0526-00595
Permit Description: CIPP and replace existing concrete collars this is a continuation of permit TR-ROW-0426-00385 06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/20/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/15/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/15/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW