Permit: TR-ROW-0526-00595
Permit Details
Apply Date:
05/15/2026
Applicant:
ANGEL MORALES
Description:
CIPP and replace existing concrete collars this is a continuation of permit TR-ROW-0426-00385 06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Permit Reviews
Permit Number - TR-ROW-0526-00595
Permit Status: Complete
Permit Description: CIPP and replace existing concrete collars
this is a continuation of permit TR-ROW-0426-00385
06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00595
Permit Status: Complete
Permit Description: CIPP and replace existing concrete collars
this is a continuation of permit TR-ROW-0426-00385
06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 05/15/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/15/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/15/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 05/15/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/15/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/15/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 05/15/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/15/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00595
Permit Description: CIPP and replace existing concrete collars
this is a continuation of permit TR-ROW-0426-00385
06/12/2026 - Request for 30 Day Renewal as of 06/21/2026
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/15/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/15/2026 | TRSP - ROW - Final | Passed |