Permit: TR-ROW-0526-00591
Permit Details
Apply Date:
05/14/2026
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Installing new 8in. water main down S Alamo Ave. This work is apart the San Fernando Phase 1 water relocation project.
Permit Reviews
Permit Number - TR-ROW-0526-00591
Permit Status: Inspections
Permit Description: Installing new 8in. water main down S Alamo Ave. This work is apart the San Fernando Phase 1 water relocation project.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/20/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/29/2026 | APPROVED |
| 05/14/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/19/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00591
Permit Status: Inspections
Permit Description: Installing new 8in. water main down S Alamo Ave. This work is apart the San Fernando Phase 1 water relocation project.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 05/18/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/18/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 05/18/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/29/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/29/2026 | Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 05/29/2026 | Pedestrian Access – Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 05/29/2026 | Survey Monument – If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
| 05/29/2026 | Traffic Control Devices - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0526-00591
Permit Description: Installing new 8in. water main down S Alamo Ave. This work is apart the San Fernando Phase 1 water relocation project.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |