Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
05/14/2026
Applicant:
Diana Dominguez
Description:
Add Swan Rd. Multi-Use path

Permit Reviews

Permit Number - TR-ROW-0526-00589
Permit Status: Complete
Permit Description: Add Swan Rd. Multi-Use path
Start Date Submittal Complete Date Status  
05/14/2026 RIGHT-OF-WAY REVIEW v.1 06/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00589
Permit Status: Complete
Permit Description: Add Swan Rd. Multi-Use path
Total Outstanding Activity Conditions - 3
Date Name
05/15/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/15/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
05/15/2026 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0526-00589
Permit Description: Add Swan Rd. Multi-Use path
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed shoulder closure and advanced warning. Signs are in place. Job site did not have an existing walkway so no reroute is needed to be provided.
09/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Rick Harris, job has begun and has an extension to work through October. Most Hardscape portions of job are completed awaiting handrail installation and minor touchups.
10/07/2026 TRSP - ROW - Backfill - Placement/Compaction Passed New sidewalk, drainage, and railing have been installed
10/07/2026 TRSP - ROW - Final Passed New multi use path has been installed with ramp sidewalk, handrail, and drainage. Traffic control devices have been collected on other side of the street and need to be picked up. Job site is clear of debris, approved.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW