Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Address NEW:
7812 E SPEEDWAY BL
Apply Date:
05/12/2026
Applicant:
Alexis Otero-Morales
Description:
remove existing 200’ of concrete channel and replace with new concrete channel. 24 hr closure ***

Permit Reviews

Permit Number - TR-ROW-0526-00578
Permit Status: Issued
Permit Description: remove existing 200’ of concrete channel and replace with new concrete channel. 24 hr closure ***
Start Date Submittal Complete Date Status  
05/13/2026 RIGHT-OF-WAY REVIEW v.1 05/19/2026 REQUIRES RESUBMIT Review Details
05/20/2026 RIGHT-OF-WAY REVIEW v.2 05/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00578
Permit Status: Issued
Permit Description: remove existing 200’ of concrete channel and replace with new concrete channel. 24 hr closure ***
Total Outstanding Activity Conditions - 6
Date Name
05/20/2026 Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell.
05/20/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/20/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/20/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/20/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/28/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses during construction.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
CONCRETE CHANNEL SITE PLAN_V1.PDF DOCUMENTS VIEW
WYCO ENGINEERING - 812 E SPEEDWAY BLVD - EUCLID SIDEWALK CL PLAN 12 - WATERLINE CAPSTONE_V1.PDF DOCUMENTS VIEW