Permit: TR-ROW-0526-00577
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
9558 E CORTE PUENTE DEL SOL
Address NEW:
9558 E CORTE PUENTE DEL SOL
Apply Date:
05/12/2026
Applicant:
Adrian Dominguez
Description:
Repair of a small section of the sidewalk per PAG SD 200
Permit Reviews
Permit Number - TR-ROW-0526-00577
Permit Status: Inspections
Permit Description: Repair of a small section of the sidewalk per PAG SD 200
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00577
Permit Status: Inspections
Permit Description: Repair of a small section of the sidewalk per PAG SD 200
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/13/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/13/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0526-00577
Permite Description: Repair of a small section of the sidewalk per PAG SD 200
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Deferred |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0526-00577
Permit Description: Repair of a small section of the sidewalk per PAG SD 200
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Adrian, aiming for a one day replacement job on Wednesday 6/3. Will contact me on progress and photos as job is completed. | |
| 06/11/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 06/15/2026 | TRSP - ROW - Final | Passed |