Permit: TR-ROW-0526-00574
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4351 N FAIRVIEW AV
Address NEW:
4351 N FAIRVIEW AV
Apply Date:
05/12/2026
Applicant:
James CastaƱeda
Description:
Geotech Borings - Coring asphalt and hand augered soil borings at 3 locations (see map) along Fairview. Traffic Control will be used. Borings will be up to 4' depth
Permit Reviews
Permit Number - TR-ROW-0526-00574
Permit Status: Complete
Permit Description: Geotech Borings - Coring asphalt and hand augered soil borings at 3 locations (see map) along Fairview. Traffic Control will be used. Borings will be up to 4' depth
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | REQUIRES RESUBMIT |
| 05/14/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00574
Permit Status: Complete
Permit Description: Geotech Borings - Coring asphalt and hand augered soil borings at 3 locations (see map) along Fairview. Traffic Control will be used. Borings will be up to 4' depth
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/14/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/14/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00574
Permit Description: Geotech Borings - Coring asphalt and hand augered soil borings at 3 locations (see map) along Fairview. Traffic Control will be used. Borings will be up to 4' depth
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con held on site and verified through photos of the uploads. This is for soil samples for the roadway between miracle Mile, and Wetmore on Fairview. Script read and understood. PIO was already notified downtown. | |
| 06/16/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/23/2026 | TRSP - ROW - Final | Passed | This is for sampling the roadway work completed slurry backfilled every 4 foot hole that was 4 inches round |