Permit: TR-ROW-0526-00572
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3300 N FAIRVIEW AV
Address NEW:
3300 N FAIRVIEW AV
Apply Date:
05/12/2026
Applicant:
James CastaƱeda
Description:
Geotech Borings - 5 locations with asphalt coring and hand augered soil borings within Fairview Ave. See map for locations. Traffic control will be used
Permit Reviews
Permit Number - TR-ROW-0526-00572
Permit Status: Complete
Permit Description: Geotech Borings - 5 locations with asphalt coring and hand augered soil borings within Fairview Ave. See map for locations. Traffic control will be used
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | REQUIRES RESUBMIT |
| 05/14/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00572
Permit Status: Complete
Permit Description: Geotech Borings - 5 locations with asphalt coring and hand augered soil borings within Fairview Ave. See map for locations. Traffic control will be used
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/14/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/14/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00572
Permit Description: Geotech Borings - 5 locations with asphalt coring and hand augered soil borings within Fairview Ave. See map for locations. Traffic control will be used
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con held on site and verified through photos of the uploads. This is for soil samples for the roadway between miracle Mile, and Wetmore on Fairview. | |
| 06/15/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | they are currently doing core samples for road conditions doing 4 foot samples and then slurry backfilling every hole per pag standards | |
| 06/23/2026 | TRSP - ROW - Final | Passed | All sampling has been complete. All work is.Completed |