Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
3760 N ORACLE RD
Address NEW:
3760 N ORACLE RD
Apply Date:
05/11/2026
Applicant:
Antonio Lopez - National Barricade Company
Description:
HAWK PROJECT ***High-Intensity Activated Crosswalk***

Permit Reviews

Permit Number - TR-ROW-0526-00568
Permit Status: In review
Permit Description: HAWK PROJECT ***High-Intensity Activated Crosswalk***
Start Date Submittal Complete Date Status  
05/11/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00568
Permit Status: In review
Permit Description: HAWK PROJECT ***High-Intensity Activated Crosswalk***
Total Outstanding Activity Conditions - 3
Date Name
05/12/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/12/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/12/2026 Traffic control set-up approved between 9AM - 3:30PM