Permit: TR-ROW-0526-00554
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW)
Address:
1000 S DEL VALLE AV
Address NEW:
1000 S DEL VALLE AV
Apply Date:
05/07/2026
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Permit Reviews
Permit Number - TR-ROW-0526-00554
Permit Status: In review
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project.
07/06/2026- new design plan was sent in for revision.
07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 07/10/2026 | APPROVED |
| 05/07/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/19/2026 | REQUIRES RESUBMIT |
| 05/20/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00554
Permit Status: In review
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project.
07/06/2026- new design plan was sent in for revision.
07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/08/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/08/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 05/22/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/22/2026 | Fire Station #9 - The contractor shall coordinate with the nearby fire station prior to implementing any road closures or traffic control that may impact emergency access. The contractor shall maintain access for emergency vehicles at all times when working near fire stations, hospitals, or emergency response routes. The contractor shall notify the fire station a minimum of 48 hours prior to the start of work and coordinate any necessary accommodations to ensure emergency response is not delayed |
| 05/22/2026 | Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
Outstanding Inspections
Permit Status: In Review
Permit Number: TR-ROW-0526-00554
Permite Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project.
07/06/2026- new design plan was sent in for revision.
07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2026 | TRSP - ROW - Final | N/A | Re-inspection required | |
| 11/17/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass | |
| 10/19/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Partial Pass |
Completed Inspections
Permit Status: In Review
Permit Number: TR-ROW-0526-00554
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project.
07/06/2026- new design plan was sent in for revision.
07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |