Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address NEW:
1000 S DEL VALLE AV
Apply Date:
05/07/2026
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.

Permit Reviews

Permit Number - TR-ROW-0526-00554
Permit Status: In review
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Start Date Submittal Complete Date Status  
07/06/2026 RIGHT-OF-WAY REVIEW REVISION v.1 07/10/2026 APPROVED Review Details
05/07/2026 RIGHT-OF-WAY REVIEW v.1 05/19/2026 REQUIRES RESUBMIT Review Details
05/20/2026 RIGHT-OF-WAY REVIEW v.2 05/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0526-00554
Permit Status: In review
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Outstanding Activity Conditions - 5
Date Name
05/08/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/08/2026 Traffic Control set-up approved between 7AM - 5PM
05/22/2026 Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/22/2026 Fire Station #9 - The contractor shall coordinate with the nearby fire station prior to implementing any road closures or traffic control that may impact emergency access. The contractor shall maintain access for emergency vehicles at all times when working near fire stations, hospitals, or emergency response routes. The contractor shall notify the fire station a minimum of 48 hours prior to the start of work and coordinate any necessary accommodations to ensure emergency response is not delayed
05/22/2026 Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary

Outstanding Inspections

Permit Status: In Review
Permit Number: TR-ROW-0526-00554
Permite Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/19/2026 TRSP - ROW - Final N/A Re-inspection required
11/17/2026 TRSP - ROW - Barricade - Setup/Routine N/A Partial Pass
10/19/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Partial Pass

Completed Inspections

Permit Status: In Review
Permit Number: TR-ROW-0526-00554
Permit Description: Installing new 8in. water main down S Del Valle Ave. This work is apart the San Fernando Phase 2 water relocation project. 07/06/2026- new design plan was sent in for revision. 07/24/26- renew permit for 90 days as of 07/27/26 new expiration date is 10/22/26.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/02/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PHASE 2 SIGNED APPROVED PLANS_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
SITE MAP_V1.PDF DOCUMENTS VIEW
TW_PN_0326_0002R2-CONS-TW-PLAN-0326-0002_V1_V2.PDF DOCUMENTS VIEW
SAN FERNANDO DEL VALLE AVE TCPS_V1.PDF DOCUMENTS VIEW