Permit: TR-ROW-0526-00534
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
3450 N FAIRVIEW AV
Address NEW:
3450 N FAIRVIEW AV
Apply Date:
05/05/2026
Applicant:
James CastaƱeda
Description:
Coring Asphalt and Hand-Augered borings at 14 locations along Fairview Ave from Grant Road to Wetmore Road. Borings will extend up to 4 feet below the surface. Traffic Control will be used
Permit Reviews
Permit Number - TR-ROW-0526-00534
Permit Status: Inspections
Permit Description: Coring Asphalt and Hand-Augered borings at 14 locations along Fairview Ave from Grant Road to Wetmore Road. Borings will extend up to 4 feet below the surface. Traffic Control will be used
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/28/2026 | APPROVED |
| 05/05/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00534
Permit Status: Inspections
Permit Description: Coring Asphalt and Hand-Augered borings at 14 locations along Fairview Ave from Grant Road to Wetmore Road. Borings will extend up to 4 feet below the surface. Traffic Control will be used
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/14/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/14/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/14/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/14/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0526-00534
Permit Description: Coring Asphalt and Hand-Augered borings at 14 locations along Fairview Ave from Grant Road to Wetmore Road. Borings will extend up to 4 feet below the surface. Traffic Control will be used
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con held on site and verified through photos of the uploads. This is for soil samples for the roadway between miracle Mile, and Wetmore on Fairview. Script read and understood. PIO was already notified downtown. |