Permit: TR-ROW-0526-00533
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
5901 S CALLE SANTA CRUZ
Address NEW:
5901 S CALLE SANTA CRUZ
Apply Date:
05/05/2026
Applicant:
BRIAN MAJUTA JR - Quail Construction
Description:
Air-Vacuum Excavation of 18 Utility Potholes
Permit Reviews
Permit Number - TR-ROW-0526-00533
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 18 Utility Potholes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00533
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 18 Utility Potholes
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/08/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 05/08/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/08/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES |
| 05/08/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/08/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00533
Permit Description: Air-Vacuum Excavation of 18 Utility Potholes
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/02/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/02/2026 | TRSP - ROW - Final | Passed |