Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0525-00740
Permit Details
Apply Date:
05/29/2025
Applicant:
Ben Cox
Description:
Need to enter ROW to install one single 4" permanent power conduit to connect our building to an existing transformer.Work will take place from 7am - 5pm Monday to Friday. Barricades will be left in place 24 hours until work is complete.
Permit Reviews
Permit Number - TR-ROW-0525-00740
Permit Status: Complete
Permit Description: Need to enter ROW to install one single 4" permanent power conduit to connect our building to an existing transformer.Work will take place from 7am - 5pm Monday to Friday. Barricades will be left in place 24 hours until work is complete.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00740
Permit Status: Complete
Permit Description: Need to enter ROW to install one single 4" permanent power conduit to connect our building to an existing transformer.Work will take place from 7am - 5pm Monday to Friday. Barricades will be left in place 24 hours until work is complete.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/30/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/30/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00740
Permit Description: Need to enter ROW to install one single 4" permanent power conduit to connect our building to an existing transformer.Work will take place from 7am - 5pm Monday to Friday. Barricades will be left in place 24 hours until work is complete.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/17/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Forms are solid, stakes are capped for safety, and compaction looks good | |
| 06/23/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/08/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/28/2025 | TRSP - ROW - Final | Passed |